Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Specify Needs phase doesn't explicitly refer to proposing statistical solution options to addressing client needs, it just separately mentions various aspects of these solutions, probably because a survey solution is assumed. Some of the sub-processes also don't seem big enough to warrant being explicit at this level (e.g. identify concepts).  In the new ABS Business Architecture we have combined and re-focussed 1.1 - 1.5 into two sub-processes -  'Understand and confirm statistical needs' and 'Scope statistical solution' (scoping and preparing a high level solution design is effectively what a business area does to get approval to proceed with the project, and before the detailed design, build/assembly and implementation processes commence in earnest). To be in scope of the GSBPM any solutions prepared would need to result in the creation of data outputs.

 

 

Viewtracker
hidetrue

 

Show If
currentSpace
groupconfluence-administrators
falsedd-MMM-yyyy