UN/CEFACT New Projects

Label: p1009

Content with label p1009 in UN/CEFACT New Projects (See content from all spaces)
Related Labels: odp6 , rsm , p1009_odp1_doc , odp5 , p1009_odp1 , p1009_odp2_doc , odp4 , odp2 , odp7 , by_mirimmedialab , sectoral , p1009_odp2 , odp3 , be_updateing , destnationtravelinformation , dti_businessrequirementlist

P1009 - ODP 6 - Publication
property.key = value Table of Content Specifications Comment Logs P1009 Submission Draft Updated Comment Log Change Requests Contributions Presentation and Upload In order to categorize correctly, please use the following prefix in the filenames: "Specification..." for category "Specifications" "CommentLog ...
P1009 - ODP 7 - Maintenance
property.key = value Table of Content Specifications Comment Logs P1009 Submission Draft Updated Comment Log Change Requests Contributions Presentation and Upload In order to categorize correctly, please use the following prefix in the filenames: "Specification..." for category "Specifications" "CommentLog ...
P1009 - Project Inception
Table of Content 1. Project purpose The project's purpose is \\ \\ Version: 1.0 2. Project scope Specify project scope in terms of inscope and outofscope items within the context of the UN/CEFACT Programme of Work. Include a description indicating the relationship between ...
P1009 - Requirements Gathering000
Title is P1009 Requirements Gathering000
RSM Committee Draft 12.NOVEMBER. 2014 Rev. x
Table of Content 1. REFERENCES DOCUMENT 2.INTRODUCTION   2.1 PURPOSE AND SCOPE 2.2 TARGET SOLUTION 2.3 BUSINESS REQUIREMENTS SUMMARY  2.4 BUSINESS PROCESSES, INFORMATION ENVELOPES AND AUTHORISED ROLES  2.5 BUSINESS PARTNER TYPES AND AUTHORISED ROLES  2.5.1 ...
RSM Working Draft 09.JULY. 2014 Rev. 0
Table of Content 1. REFERENCES DOCUMENT 2.INTRODUCTION   2.1 PURPOSE AND SCOPE 2.2 TARGET SOLUTION 2.3 BUSINESS REQUIREMENTS SUMMARY  2.4 BUSINESS PROCESSES, INFORMATION ENVELOPES AND AUTHORISED ROLES  2.5 BUSINESS PARTNER TYPES AND AUTHORISED ROLES  2.5.1 ...