Table of Content
- Table of Content
- 1. Project purpose
- 2. Project scope
- 3. Project deliverables
- 4. Exit criteria
- 5. Project Team membership and required functional expertise
- 6. HoD support(required for technical standards, business standards and UNECE recommendations
- 7. Geographical Focus
- 8. Initial contributions
- 9. Resource Requirements
- 10. Project Leadership
- 11. Milestones (repeat per deliverable)
1. Project purpose
The project's purpose is to create Business Process Models and Business Class Diagrams for documenting the business scenarios and business transactions involved in the electronic exchange of the agricultural laboratory observations between a laboratory and its partners.
Version: 1.0
2. Project scope
The objective of this project is to standardize the Business Processes, the Business Transactions and the Information Entities of the electronic exchange of the laboratory observation report between a laboratory and its partners.
This project will describe the business processes for the electronic exchange of the laboratory observation report between a laboratory and its partners. The observation report contains information about the measurements and observations performed in a laboratory on one or more samples of crops, live animals, post mortem material, animal products, plant products, soil, animal feed, silage, soil and so on.
The laboratory observation report is used by several business partners to provide quality and health information about agricultural commodities and products, about plant health and animal health and abiotic conditions (soil and water). The business partners are active in trade, transport, food processing, animal feed, farming, agri consultancy, finance and insurance.
3. Project deliverables
The project deliverables are
- A catalogue of Business Process Models using UMM/UML covering the e-laboratory observation report exchange
- A guide for users which enables them to select the model appropriate to their needs
- The class diagrams of the business transactions for the creation of the XML message
- The BRS and RSM documents
- XML schema to support the business transactions
4. Exit criteria
For each deliverable, list the criteria that when met will indicate the deliverable has been completed...
5. Project Team membership and required functional expertise
Membership is open to experts with broad knowledge in the area of agriculture, horticulture, crop farming, animal farming, livestock, animal and plant health, laboratory observation and reporting and EDI and their e-business operation, and the functions of UN/CEFACT and its groups. In addition, Heads of Delegations may invite technical experts from their constituency to participate in the work. Experts are expected to contribute to the work based solely on their expertise and to comply with the UN/CEFACT Code of Ethics.
6. HoD support(required for technical standards, business standards and UNECE recommendations
List at least three Country heads of delegation who support this project, and include their written expression of support using the template in annex IV...
The project is supported by The Netherlands, France, and Italy.
7. Geographical Focus
The geographical focus is global.
8. Initial contributions
ISO and HL7 standards and LOINC will be considered.
The following working documents drafted by a working group which was organized in the Netherlands to facilitate this project, could be submitted as part of this proposal. It is understood that these contributions are only for consideration by the project team and that other participants may submit additional contributions in order to ensure that as much information as possible is obtained from those with expertise and a material interest in the project.
9. Resource Requirements
Resources required are business experts with a broad knowledge of electronic data exchange and EDI in any region or country. Modeling expertise is also required in the project.
Note: The project does not require any additional resources from the UN/ECE secretariat.
10. Project Leadership
| Project Leader: | Frans VAN DIEPEN | [ (f.van.diepen@minlnv.nl)] |
|---|---|---|
| Editors: | Henk ZWINKELS | [ (HZ@agritect.nl)] |
[Note to user: Each UN/CEFACT project proposal must specify the name and email address of at least one proposed Project Convener and at least one proposed Editor.]
11. Milestones (repeat per deliverable)
| ODP Step | ODP Name | Estimated Completion Date | Comment |
|---|---|---|---|
| 1 | Project Inception | 30.06.2012 | Comment |
| 2 | Requirements Gathering | 31.07.2012 | Comment |
| 3 | Draft Development | 30.09.2012 | Comment |
| 4 | Public Review | 30.06.2013 | Comment |
| 5 | Project Exit | Comment | |
| 6 | Publlication | 30.06.2013 | Comment |
| 7 | Maintenance | 30.06.2013 | Starts after this date |
Table of Content
Relevant Documents
Comment Logs
Change Requests
Contributions
Presentation and Upload
| Upload Information In order to categorize correctly, please use the following prefix in the filenames:
|
Agendas and Meetings
Next Meeting
Invitations and AgendaNo content is labeled with Sectoral,#domain#,p1005,odp1,agenda |
NotesNo content is labeled with Sectoral,#domain#,p1005,odp1,minutes |
Meeting Participation
[edit?]
Registered UsersNo results were found for groups : #wg# |
ContributionsContributions of Page Information:
Contributions of News:
|
TrackingUnknown macro: {tracking-table}
Unknown macro: {tracking-column}
Unknown macro: {tracking-column}
Unknown macro: {tracking-column}
Unknown macro: {tracking-column} |